Gadkari to lay foundation stone for six-lane NH project to connect Ring Road – DND Junction with Delhi-Mumbai Expressway

0
2361
NHAI Highway India
NHAI Highway India
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:2 Minute, 11 Second

Shri Nitin Gadkari to lay foundation stone for six-lane NH project to connect Ring Road – DND Junction with Delhi-Mumbai Expressway

The project will reduce traffic congestion in Ashram-Badarpur-Faridabad-Ballabhgarh region

By PIB Delhi

Union Minister for Road Transport & Highways, Shipping and Water Resources, River Development and Ganga Rejuvenation Shri Nitin Gadkari will lay the foundation stone for a six-lane access-controlled NH project at Kalindi Kunj-Meethapur Road in Delhi tomorrow. The over 59 km long highway will start at Ring Road-DND junction and will pass through Kalindi bypass and Faridabad-Ballabhgarh bypass, and will finish at the interchange of Delhi-Mumbai Expressway at KMP. The cost of this project is estimated at Rs 3580 crore.

The project will have 3+3 lane service roads on either sides for about 29 km, 7.350 km of elevated section with two level crossings at four locations of Metro line, 18 new underpasses, and nine interchanges with improved junctions. The project will decongest Delhi with reduction of traffic congestion in Ashram-Badarpur-Faridabad-Ballabhgarh region. This is expected to result in reduction of vehicular pollution.

This project would be in addition to the nine other progects being implemented for decongesting NCR Delhi. These include the 3 km signal free corridor from Dhaula – Kuan to Airport at a cost of Rs 280 Crore, which is about 40 % completed; the 22 km, 6-lane elevated corridor on Gurugram-Sohna Road costing Rs 2000 Crore on which work has started; 8-lane Delhi-Panipat highway from Mukarba Chowk to Panipat on NH-1 being constructed at a cost of Rs 2300 and nearly 48 % done; the 29 km, 8 lane access controlled Dwarka Expressway costing about Rs 9500 crore on which work has started; package II, III and IV of Delhi-Meerut Expressway costing Rs 5900 Crore, where package II is  36 % done, package III in 76% done and package IV is 32    % done; 4 laning of 124 km Khekra – EPE junction to Shamli-Saharanpur (NH-709 B) at a cost of about Rs 1200 Crore; Rangpuri Bypass to connect Dwarka/NH-08 with Vasant Kunj-Nelson Mandela Road at a cost of Rs 1000 Crore, which is in DPR stage; 75 km Urban Extension Road (UER-2) third Ring Road for Delhi under Bharatmala to be developed at a cost of Rs 4000 Crore which is in DPR stage and the 31.3 km, 6-lane access controlled corridor from Akshardham NH24 Junction to EPE Junction on Baghpat Road at a cost of about Rs2600 Crore.

About Post Author

Antara Tripathy

Chief Editor & CEO of IBG NEWS (09/Aug/2018-Present), Secretary of All Indian Reporter's Association,West Bengal State Committee. Earlier Vice President of IBG NEWS (01/Jan/ 2013-08/Aug/2018). She took over the charge from the Founder Editor of the Channel.
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here