Master plan for flood control in Hooghly – West Benga; Irrigation Department to carry out major work to ensure no flood in future

0
2620
Flood - Disaster Management
Flood - Disaster Management
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:53 Second

Master plan for flood control in Hooghly

Master plan for flood control in Hooghly

A master plan has been prepared by the Bengal Government’s Irrigation Department to carry out major work to ensure that flood-like situations become history for people residing in Hooghly district and its surrounding regions.

The department has taken up a major project of strengthening embankments and improvement of other necessary infrastructure in Hooghly to avoid flood-like situations during monsoon. The main tasks that will be carried out include strengthening of embankments, de-siltation of rivers and dredging of canals.

The project will be carried out in two phases – in the first phase in Arambagh and Goghat and in the second phase in Khanakul and Pursura. While Rs 60 crore would be spend for the first phase, Rs 80 crore would be spent for the second.

It may be mentioned that two master plans have been prepared to check floods in north Bengal. One master plan is for Cooch Behar, Jalpaiguri, Alipurduar and Darjeeling district while the other one is for Malda, Uttar Dinajpur and Dakshin Dinajpur districts.

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here