Government of India approves new transmission schemes worth ₹13,595 crore to evacuate 4.5 GW RE power each from Rajasthan and Karnataka

0
584
Electricity
Electricity
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:1 Minute, 1 Second

Government of India approves new transmission schemes worth ₹13,595 crore to evacuate 4.5 GW RE power each from Rajasthan and Karnataka

By PIB Delhi

The Government of India has approved new Inter State Transmission System (ISTS) schemes to evacuate 9 GW of RE power from Rajasthan and Karnataka. These schemes will be implemented through Tariff Based Competitive Bidding (TBCB) mode. These schemes are part of 500 GW RE capacity by 2030 out of which 200 GW is already connected.

2. Brief of the approved schemes is as under:

  1. The power evacuation scheme of Rajasthan Renewable Energy Zone (REZ) will evacuate 4.5 GW of RE power from Rajasthan. It comprises 1 GW from Fatehgarh complex, 2.5 GW from Barmer Complex and 1 GW from Nagaur (Merta) Complex. This power will be transferred to Mainpuri Region, Fatehpur and Orai of Uttar Pradesh. The completion period of the scheme is two years. Cost of the scheme is about ₹12,241 crore.
  2. The System strengthening scheme of Karnataka will evacuate 4.5 GW RE power from Koppal area and Gadag area. The scheme will be completed by June 2027. Cost of the scheme is about ₹1,354 crore.

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here