All modules getting ready for Chandrayaan-2 launch during the window of July 09 to July 16, 2019

0
1810
Indian aspiration for Moon - Chandrayaan-II Mission by ISRO will deploy a rover on the lunar surface
Indian aspiration for Moon - Chandrayaan-II Mission by ISRO will deploy a rover on the lunar surface
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:50 Second

All modules getting ready for Chandrayaan-2 launch during the window of July 09 to July 16, 2019

By PIB Delhi

Chandrayaan-2, India’s second lunar mission, has three modules namely Orbiter, Lander (Vikram) & Rover (Pragyan).

The Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle.

The Rover is housed inside the Lander. After launch into earth bound orbit by GSLV MK-III, the integrated module will reach Moon orbit using Orbiter propulsion module. Subsequently, Lander will separate from the Orbiter and soft land at the predetermined site close to lunar South Pole. Further, the Rover will roll out for carrying out scientific experiments on the lunar surface. Instruments are also mounted on Lander and Orbiter for carrying out scientific experiments.

All the modules are getting ready for Chandrayaan-2 launch during the window of July 09 to July 16, 2019, with an expected Moon landing on September 06, 2019.

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here