Bridge constructed by Border Roads Organisation over Teesta River in North Sikkim opened for traffic

0
1120
Bridge constructed by Border Roads Organisation over Teesta River in North Sikkim opened for traffic
Bridge constructed by Border Roads Organisation over Teesta River in North Sikkim opened for traffic
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:46 Second


In a relief to the residents of Lachen in North Sikkim, the Border Roads Organisation (BRO) today opened for traffic 360 feet long bailey suspension bridge over Teesta River in Munshithang near Chungthang town. The 86 Road Construction Company (RCC) of 758 Border Roads Task Force (BRTF), under Project Swastik, commenced the construction of the bridge in October 2019 and completed it in January 2020. 

The approach roads to the bridge have also been constructed. The bridge will give impetus to tourism and facilitate the movement of logistics for the Armed Forces deployed in forward areas. 

In June 2019, a steel bridge of 180 feet span at the same location was completely damaged due to a massive cloud burst resulting in severing the lines of communication in North District of Sikkim. The connectivity was kept open by routing the traffic through restricted Army land.

ABB/SS/Nampi/KA/DK/Savvy

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here