Saturday, October 24, 2026
WA
Home Business TRIAL RUNS ON THE KAVI SUBHASH – HEMANTA MUKHOPADHYAY STRETCH OF ORANGE...

TRIAL RUNS ON THE KAVI SUBHASH – HEMANTA MUKHOPADHYAY STRETCH OF ORANGE LINE CONTINUED TODAY

0
808
Trial Runs on Kavi Subhash- Hemanta Mukhopadhyay stretch of Orange Line continued today, i.e. on 20.02.2024.
Trial Runs on Kavi Subhash- Hemanta Mukhopadhyay stretch of Orange Line continued today, i.e. on 20.02.2024.

TRIAL RUNS ON THE KAVI SUBHASH – HEMANTA MUKHOPADHYAY STRETCH OF ORANGE LINE CONTINUED TODAY

Kolkata, Date: 20.02.2024

Trial Runs on the Kavi Subhash- Hemanta Mukhopadhyay stretch of Orange Line continued today, i.e. on 20.02.2024. Today’s trial runs started at 13:20 hrs on this stretch from Kavi Subhash station in the presence of senior Metro officials in order to keep machinery and staff ready for the commercial services. This 5.4-km stretch of Orange Line is ready for commissioning and these trial runs are necessary for the preparation.

During the trial runs, 6 round trips were made with a Medha AC rake at a maximum speed of 40 Kmph on both the lines. This trial run ended at 15.41 hrs.

During the trial run many parameters like track fitness, emergency brake, power supply, proper docking of rake, response of the station staff, etc were rigorously checked.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add https://www.ibgnews.com to your ad blocking whitelist or disable your adblocking software.

×
Verified by MonsterInsights