Sunday, September 20, 2026
WA
Home Business IMPLEMENTATION OF BHARATMALA PARIYOJAN

IMPLEMENTATION OF BHARATMALA PARIYOJAN

0
1410
NHAI - India
NHAI - India

IMPLEMENTATION OF BHARATMALA PARIYOJAN

By PIB Delhi

Bharatmala Pariyojana was approved by Government in 2017 covering a length of 4,800 km across the country. As on 28.02.2025, projects covering a total length of 26,425 km have been awarded and out of this, 19,826 km have already been constructed. The state-wise details are annexed.

State Wise details of Awarded and Constructed length under BharatmalaPariyojana Phase – I
StateLength of Awarded Projects(km)Length Constructed(km)
Andhra Pradesh1,9361,070
Assam431381
Bihar1,159672
Chhattisgarh471291
Delhi203183
Goa2626
Gujarat1,194977
Haryana1,058940
Himachal Pradesh167115
Jammu & Kashmir251131
Jharkhand801481
Karnataka1,6031,109
Kerala708443
Madhya Pradesh2,0171,586
Maharashtra2,1741,878
Manipur635417
Meghalaya170112
Mizoram593461
Nagaland208157
Odisha967909
Punjab1,553692
Rajasthan2,3602,251
Tamil Nadu1,4761,230
Telangana1,026793
Tripura9468
Uttar Pradesh2,4961,964
Uttarakhand264163
West Bengal385324
Total26,42519,826

Bharatmala Pariyojana is envisaged to improve the logistics efficiency and connectivity in the country including connectivity to tribal, aspirational and LWE affected districts while reducing accident on the these Highways ensuring safer transportation networks. Development of high-speed corridors will also reduce the travel time substantially between key economic centers. Various Industrial Hubs, NMP nodes, MMLPs, Ports and Airports to be provided high-speed connectivity through these corridors.

As of February 2025, 6,669 km length of high speed greenfield corridors has been awarded with construction completed for 4,610 km.

In so far as National Highways (NHs) are concerned, works are carried out as per standards, guidelines, manual, code of practice of Indian Roads Congress as well as Specification for Road and Bridge Works. Necessary road safety measures are taken during design, construction, operation and maintenance stages. Further, Guidelines have been issued for regular safety audit of all NHs at design, construction, pre-opening stage of NH projects as well as on existing NHs for ensuring road safety.

Many Smart Technologies such as Automated & intelligent Machine-aided construction (AI-MC), LIDAR and drone based analytics etc is being adopted in Highway Construction.

This information was given by the Union Minister of Road Transport and Highways, Shri Nitin Jairam Gadkari in a written reply to the Lok Sabha.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add https://www.ibgnews.com to your ad blocking whitelist or disable your adblocking software.

×
Verified by MonsterInsights