Tag: GREEN LINE
NEW TIMETABLE OF GREEN LINE ON SEALDAH TO SALT LAKE SECTOR V STRETCH FROM...
NEW TIMETABLE OF GREEN LINE ON SEALDAH TO SALT LAKE SECTOR V STRETCH FROM 15.04.2024 (MONDAY)
Kolkata, Date: 14.04.2024
From 15.04.2024 (Monday) the time-table of Kolkata Metro's Green Line on Sealdah to Salt Lake Sector V...
TRIAL RUNS WITH AUTOMATIC TRAIN OPERATION (ATO) SYSTEM ON GREEN LINE CONDUCTED
TRIAL RUNS WITH AUTOMATIC TRAIN OPERATION (ATO) SYSTEM ON GREEN LINE CONDUCTED
Kolkata, Date:-28.01.2024
Trial runs were conducted with Automatic Train Operation (ATO) System mode in between Salt Lake Sector V to Sealdah stretch of East-West...