Friday, October 23, 2026
WA
Home India HPCL reported Progress of setting up of Barmer Refinery in Rajasthan

HPCL reported Progress of setting up of Barmer Refinery in Rajasthan

0
4054
Barmer Rajasthan

Progress of setting up of Barmer Refinery

By PIB Delhi

Hindustan Petroleum Corporation Limited (HPCL) has informed that there are no roadblocks in setting up the 9 MMTPA Refinery-cum-petrochemical complex at an approved cost of Rs. 43,129 crore at Pachpadra in Barmer district of Rajasthan.

In addition to Motor Spirit and Diesel, the Refinery envisages production of major products like Ethylene and Propylene derivatives. These derivatives are used as feedstock in various ancillary industries viz. packaging, textile, petrochemical industry, etc.

The Refinery project is likely to provide direct employment to about 1,500 skilled manpower and during the construction stage, the refinery is expected to generate indirect employment for about 30,000 persons.

This information was given by the Union Minister of Petroleum & Natural  Gas Shri Dharmendra Pradhan in a written reply to the Rajya Sabha today.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Adblocker detected! Please consider reading this notice.

We've detected that you are using AdBlock Plus or some other adblocking software which is preventing the page from fully loading.

We don't have any banner, Flash, animation, obnoxious sound, or popup ad. We do not implement these annoying types of ads!

We need money to operate the site, and almost all of it comes from our online advertising.

Please add https://www.ibgnews.com to your ad blocking whitelist or disable your adblocking software.

×
Verified by MonsterInsights