KAVI SUBHASH-HEMANTA MUKHOPADHYAY FARE STRUCTURE FINALISED
INTEGRATED TICKETING SYSTEM TO BE INTRODUCED IN BETWEEN BLUE LINE AND ORANGE LINE
Kolkata, Date: 19.12.2023
Commercial services on the Kavi Subhash-Hemanta Mukhopadhyay stretch of the Kavi Subhas-Jai Hind (Airport) Metro Corridor (Orange Line) are going to start very soon. The Railway Board has approved the fare structure on this route. The minimum fare for travelling on this route will be ₹. 5/- and the maximum fare will be ₹. 20/. The fare chart on this line is given below:Kavi Subhash Satyajit Ray Jyotirindra Nandi Kavi Sukanta Hemanta Mukhopadhyay Kavi Subhash 0 ₹ 5/- ₹ 10/- ₹ 10/- ₹ 20/- Satyajit Ray ₹ 5/- 0 ₹ 5/- ₹ 10/- ₹ 10/- Jyotirindra Nandi ₹ 10/- ₹ 5/- 0 ₹ 5/- ₹ 10/- Kavi Sukanta ₹ 10/- ₹ 10/- ₹ 5/- 0 ₹ 5/- Hemanta Mukhopadhyay ₹ 20/- ₹ 10/- ₹ 10/- ₹ 5/- 0
For the first time, an Integrated Ticketing System will be introduced between the Blue Line and Orange Line of Kolkata Metro once the stretch from Kavi Subhash to Hemanta Mukhopadhyay station is commissioned. As a result, any passenger will be able to travel seamlessly from Dakshineswar or any other station of the Blue Line to Hemanta Mukhopadhyay or any other station of the Orange Line and vice versa with the help of a single token or Smart Card.
The fares from different stations of North-South Metro (Blue Line) to Hemanta Mukhopadhyay (Orange Line) and vice versa are given below:Originating station Terminating station Fare (₹) Dakshineswar or any station upto Sovabazar- Sutanuti Hemanta Mukhopadhyay 45/- Girish Park or any station upto Rabindra Sarovar -DO- 40/- Mahanayak Uttam Kumar or any station upto Masterda Surya Sen -DO- 35/- Gitanjali or Kavi Nazrul -DO- 30/- Sahid Khudiram -DO- 25/-