10 Vande Bharat Sleeper trains under production; manufacturing of 200 Vande Bharat Sleeper Rakes awarded to Technology partners: Shri Ashwini Vaishnaw

0
1231
Vande Bharat Trains
Vande Bharat Trains
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:2 Minute, 23 Second

10 Vande Bharat Sleeper trains under production; manufacturing of 200 Vande Bharat Sleeper Rakes awarded to Technology partners: Shri Ashwini Vaishnaw

For world-class travel experience, Indian Railways produced only LHB coaches from April 2018 onwards; the number of LHB coaches manufactured is more than 16 times during 2014-24 compared to 2004-14: Union Railway Minister

As part of the “Sugamya Bharat Mission”, Indian Railways provides comprehensive facilities on most Mail/Express trains and Vande Bharat trains to Divyangjans and passengers with reduced mobility: Shri Vaishnaw

By PIB Delhi

At present, 10 Vande Bharat Sleeper trains are under production for long and medium-distance journeys in the country. The first prototype has been manufactured and will undergo field trials. In addition, the manufacturing of 200 Vande Bharat Sleeper Rakes has also been awarded to Technology partners. The timeline of the rollout of the train is subject to the successful completion of the trials. As of 02nd December 2024, 136 Vande Bharat train services are operational on the Broad Gauge electrified network of Indian Railways for short and medium-distance journeys across the country.

Minister of Railways, Information & Broadcasting and Electronics & Information Technology Shri Ashwini Vaishnaw, in a statement laid on the table of the House of Lok Sabha, said that in order to give world-class travel experience, 136 Vande Bharat train services, having Chair Cars, are currently operational on the Broad Gauge electrified network of Indian Railways; up to October, 2024, overall occupancy of Vande Bharat Express trains is more than 100%.

In reply to another question, the Union Minister said that the production units of Indian Railways are producing only LHB coaches from April 2018 onwards. The production of LHB coaches has continually increased over the years. The number of LHB coaches manufactured during 2014-24 is more than 16 times (36,933) the number manufactured (2,337) during 2004-14. Indian Railways (IR) has proliferated LHB coaches which are technologically superior with features like anti-climbing arrangement, Air suspension with failure indication system, and less corrosive shell.

As part of the “Sugamya Bharat Mission” (Accessible India Campaign), Indian Railways is making significant strides in ensuring accessibility for Persons with Disabilities (Divyangjans) and passengers with reduced mobility. Under the guidelines of the Rights of Persons with Disabilities Act, 2016, comprehensive facilities have been provided like ramps, accessible parking, Braille and tactile signages, low-height counters, and lifts/escalators. Till November 2024, Indian Railways had installed 1,512 escalators across 399 stations and 1,607 lifts at 609 stations, marking a remarkable growth compared to the previous decade—an increase of 9 and 14 times, respectively. Further, dedicated coaches with wide entrances, accessible washrooms, and wheelchair parking are available on most Mail/Express trains while Vande Bharat trains offer enhanced accessibility with features like automatic doors, earmarked spaces, and Braille signage for Divyangjan.

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here