THE FIRST TRIAL RUN THROUGH WEST-BOUND TUNNEL CONDUCTED SUCCESSFULLY ON SEALDAH-ESPLANADE STRETCH OF GREEN LINE

0
869
0 0
Azadi Ka Amrit Mahoutsav

InterServer Web Hosting and VPS
Read Time:55 Second

THE FIRST TRIAL RUN THROUGH WEST-BOUND TUNNEL CONDUCTED SUCCESSFULLY ON SEALDAH-ESPLANADE STRETCH OF GREEN LINE

Kolkata, Date:21.01.2025

The first trial run on Sealdah–Esplanade stretch (2.63 km) through west-bound tunnel of Green Line has been conducted successfully today i.e. on 21.01.2025. Shri P. Uday Kumar Reddy, General Manager, Metro Railway and Chairman, Kolkata Metro Rail Corporation Limited (KMRCL), other senior officers of Metro Railway and KMRCL were present in this trial run. General Manager was present in the Motorman’s Cab during this trial run which started at 11.20 hrs from Sealdah Metro station. The trial rake (MR 607) reached Esplanade Metro station at 11.31 hrs.

Shri Reddy congratulated all for this successful trial run. He also hold a meeting with the officers of Metro Railway and KMRCL after the trial run at Esplanade Metro station.

This stretch once commissioned would be a revolutionary step in providing a modern transport system to the people of Kolkata and suburbs to reach different parts of Kolkata and adjoining areas from Sealdah and Howrah.

About Post Author

Editor Desk

Antara Tripathy M.Sc., B.Ed. by qualification and bring 15 years of media reporting experience.. Coverred many illustarted events like, G20, ICC,MCCI,British High Commission, Bangladesh etc. She took over from the founder Editor of IBG NEWS Suman Munshi (15/Mar/2012- 09/Aug/2018 and October 2020 to 13 June 2023).
Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Advertisements

USD





LEAVE A REPLY

Please enter your comment!
Please enter your name here